Customization: | Available |
---|---|
Type: | Hydraulic Pile Extractor |
Application: | Pile Machine |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
How to pull out H-beam sheet piles?used BEIYI Hydraulic sheet pile extractor with hydraulic powerpack
Working Principle
H-beam Pile Extractor grip the pile head with its clip and hydraulic cylinder compulsory jacked pile clamping apparatus, make it rise up a certain distance, then pull out pile hop by hop. It is used in clay, sand or containing a small amount of gravel soil to pull out the i-beam pile or h-beam steel piles
EngineeringApplication Scope
H-beam Hydraulic Pile Extractor is mainly used in municipal construction, pipe laying, engineering, sewage treatment, supporting the construction of tunnel.
Recycle the H-beam steel piles to reduce the disposable of h-beam piles and reduce construction cost. The whole machine can adapt narrow space and insufficient space on the top of site
Advantages
1.Similar products currently use separate pile drawing machine while our company use autonomous design one-piece structure hydraulic pile extractor. Integral lifting operation more easy and cost less time.
2.Suitable for 500mm-700mm h-beam piles and other commonly used specifications pulling operations. If you need to pull out 900mm h-beam piles, then it needs custom-made.
3.BY-BZJ-300DS Hydraulic pile extractor, modern design, chassis removable. No matter how dense is the steel pile, it can also easily pull out.
4.BY-BZJ-300LS Hydraulic pile extractor, design is more human nature, efficient. Equipped with double oil-saving cylinder, it has the function of regulating speed and can save more time. Wireless remote control, easy to learn.
You need up to 40 minutes to pull a 20 meters long Hbeam by using traditional pile drawing machine while only 15 minutes needed by using our pile extractor. About 50 piles can be pulled per day and the work efficiency is improved more than doubled . Integrated design is more easy to operate and can save more manpower which just need 2 operating staffs.
Model |
Nominal working pressure |
Rated pile drawing force |
H-beam specification |
Max.Flow |
Max.clamping force |
BYPM300LS | 32MPa | 200t | 300mm-800mm | 160L/min | 260t |
Model |
Nominal working pressure |
Rated pile drawing force |
H-beam specification |
Max.Flow |
Max.clamping force |
BYPM200DS | 32MPa | 135t | 200mm-500mm | 160L/min | 220t |
Company Information
WuXi BeiYi Excavator Parts Factory is a professional high tech enterprise based in Wu xi with an area of 5000 square meters workshop. It is established in 2000 and has convenient transportation access. We are fully committed to producing technologically advanced excavator parts and we have our own technical engineering research center and pile driving machinery engineering center. Our core team is composed of senior staff in the industry and has the international advanced R&D system and technical level. We are concerned on research and development to ensure that we can provide our customers with top quality and the innovative products
FAQ.
1. Q:How to chose the suitable model?.
A: Please kindly advise your excavator weight and your requests so that we can confirm by return which model is suitable for you.
2. Q:Do you offer after-sale service?
A: Yes, we will offer you machine operation instructions. 6 months of warranty time will offer to our customer dating from the receipt day. Besides, we will offer some spare parts for free and life long technical instruction.
3. Q:Is your machine working with noisy?
A: Our machine working with low noisy which can meet environmental protection.
Contact Information