How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack

Product Details
Customization: Available
Type: Hydraulic Pile Extractor
Application: Pile Machine
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Fast Delivery
The supplier can deliver the goods within 15 days
Raw-Materials Traceability
The supplier has traceability identification of raw materials
R&D Capabilities
The supplier has 3 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (31)
  • How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
  • How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
  • How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
  • How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
  • How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
  • How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
Find Similar Products

Basic Info.

Model NO.
BY-PM300DS
Certification
ISO9001: 2000
Condition
New
Rated Pile Drawing Force
160t
Max.Clamping Force
220t H-Beam
Payment Terms
T/T, 30% Deposit, Balance Before Shipment
Warranty
6 Months
Material
Steel
Transport Package
Wood
Specification
standard
Trademark
LYD
Origin
China
Production Capacity
100 Sets/Month

Product Description

How to pull out H-beam sheet piles?used BEIYI  Hydraulic sheet  pile extractor with hydraulic powerpack
How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
Working Principle
H-beam Pile Extractor grip the pile head with its clip and hydraulic cylinder compulsory jacked pile clamping apparatus, make it rise up a certain distance, then pull out pile hop by hop. It is used in clay, sand or containing a small amount of gravel soil to pull out the i-beam pile or h-beam steel piles

How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
EngineeringApplication Scope

How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack

How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack


H-beam Hydraulic Pile Extractor is mainly used in municipal construction, pipe laying, engineering, sewage treatment, supporting the construction of tunnel.
Recycle the H-beam steel piles to reduce the disposable of h-beam piles and reduce construction cost. The whole machine can adapt narrow space and insufficient space on the top of site

Advantages

1.Similar products currently use separate pile drawing machine while our company use autonomous design one-piece structure hydraulic pile extractor. Integral lifting operation more easy and cost less time.

2.Suitable for 500mm-700mm h-beam piles and other commonly used specifications pulling operations. If you need to pull out 900mm h-beam piles, then it needs custom-made.

3.BY-BZJ-300DS Hydraulic pile extractor, modern design, chassis removable. No matter how dense is the steel pile, it can also easily pull out.

4.BY-BZJ-300LS Hydraulic pile extractor, design is more human nature, efficient. Equipped with double oil-saving cylinder, it has the function of regulating speed and can save more time. Wireless remote control, easy to learn.

You need up to 40 minutes to pull a 20 meters long Hbeam by using traditional pile drawing machine while only 15 minutes needed by using our pile extractor. About 50 piles can be pulled per day and the work efficiency is improved more than doubled . Integrated design is more easy to operate and can save more manpower which just need 2 operating staffs.

Model

Nominal working 

pressure

Rated pile drawing force

H-beam specification

 Max.Flow 

 Max.clamping force

 BYPM300LS  32MPa 200t 300mm-800mm 160L/min 260t
Model

 Nominal 

 working  

pressure

Rated pile 

 drawing force 

H-beam 

 specification 

Max.Flow

Max.clamping 

force

BYPM200DS 32MPa 135t 200mm-500mm 160L/min 220t

Company Information

WuXi BeiYi Excavator Parts Factory is a professional high tech enterprise based in Wu xi with an area of 5000 square meters workshop. It is established in 2000 and has convenient transportation access. We are fully committed to producing technologically advanced excavator parts and we have our own technical engineering research center and pile driving machinery engineering center. Our core team is composed of senior staff in the industry and has the international advanced R&D system and technical level. We are concerned on research and development to ensure that we can provide our customers with top quality and the innovative products


We emphasize development and continually introduce new products into the market every year. Our products are sold well in domestic and international markets, such as America which are highly appraised by the clients. We pursue the management with the tenet of "Attention to detail, Keep improving, Today completed the matter today ", and will insist on "concentration, creation, achievement, value" as our company philosophy.

We will work hard to become the leader of the small and medium-sized pile driving machinery company. We appreciate you to contact us for more information and look forward to working with you.


FAQ.
1. Q:How to chose the suitable model?
.
A: Please kindly advise your excavator weight and your requests so that we can confirm by return which model is suitable for you.

 

 

2. Q:Do you offer after-sale service?

    A: Yes, we will offer you machine operation instructions. 6 months of warranty time will offer to our customer dating from the receipt day. Besides, we will offer some spare parts for free and life long technical instruction.

 

3. Q:Is your machine working with noisy?

    A: Our machine working with low noisy which can meet environmental protection.

 

Contact InformationHow to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack
How to Pull out H-Beam Sheet Piles? Used Beiyi Hydraulic Sheet Pile Extractor with Hydraulic Powerpack




 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier